Building construction
Temporary bridge
No.
Construction Name
Client
12
Sacheon Aviation Industrial Bridge Construction Project
Busan Regional Construction and Management Administration
Business Areas
Temporary bridge construction
Client
Busan Regional Construction and Management Administration
Construction Name
Sacheon Aviation Industrial Bridge Construction Project
Project Overview
Construction of a temporary bridge for the Sacheon Aviation Industrial Bridge connecting Sanam-myeon and Gonyang-myeon in Sacheon-si, Gyeongsangnam-do
Scale
Starting section: L=453.6 m (main line 362 m, bridge 91 m), B=6–8 m, area=3,240 ㎡
11
Installation and removal of a temporary bridge for Section 3-3 of the Busan Eco Delta City construction project
K-water
Business Areas
Temporary bridge construction
Client
K-water
Construction Name
Installation and removal of a temporary bridge for Section 3-3 of the Busan Eco Delta City construction project
Project Overview
Installation and removal of a temporary bridge for Section 3-3 of the Busan Eco Delta City construction project
Scale
B=10 m, L=140 m
10
Gwangyang Port Regional Dredged Soil Disposal Site Construction Project
Ministry of Oceans and Fisheries
Client
Ministry of Oceans and Fisheries
Construction Name
Gwangyang Port Regional Dredged Soil Disposal Site Construction Project
Scale
B=10 m, L=199 m B=10 m, L=212 m
9
Installation and Dismantling of the Temporary Cheongdam Bridge in Section 1 of the Public Contribution Direct Provision Facilities
Hyundai Motor Co., Ltd.
Business Areas
Temporary bridge construction
Client
Hyundai Motor Co., Ltd.
Construction Name
Installation and Dismantling of the Temporary Cheongdam Bridge in Section 1 of the Public Contribution Direct Provision Facilities
Project Overview
Cheongdam Bridge temporary bridge construction
Scale
Cheongdam Bridge 1: L=94 m, B=8 m, Area=752 ㎡ Cheongdam Bridge 2: L=99 m, B=18 m (outer), Area=1,782 ㎡
8
Temporary Bridge over Wolha Stream for the 00 Airfield Integration Relocation Construction Project
Korea Land & Housing Corporation
Business Areas
Temporary bridge construction
Client
Korea Land & Housing Corporation
Construction Name
Temporary Bridge over Wolha Stream for the 00 Airfield Integration Relocation Construction Project
Project Overview
Wolhacheon Bridge temporary bridge construction
Scale
B=8 m, L=55 m
7
Steel Structure Work (Superstructure of the Temporary Work Platform) for the Unmun Dam Safety Improvement Construction Project
K-water
Business Areas
Temporary bridge construction
Client
K-water
Construction Name
Steel Structure Work (Superstructure of the Temporary Work Platform) for the Unmun Dam Safety Improvement Construction Project
Project Overview
Steel Structure Work (Superstructure of the Temporary Work Platform) for the Unmun Dam Safety Improvement Construction Project
Scale
B=6 m, L=26.9 m B=6–10 m, L=64.8 m
6
Seosan Hyundai Motor Straight Driving Test Road Infrastructure_Temporary Construction Bridge Installation and Removal
Hyundai Engineering & Construction Co., Ltd.
Client
Hyundai Engineering & Construction Co., Ltd.
Construction Name
Seosan Hyundai Motor Straight Driving Test Road Infrastructure_Temporary Construction Bridge Installation and Removal
Scale
B=10 m, L=85 m
5
Steel Structure (Civil Engineering) Installation Project for Anseong-Guri (Section 14) of the Sejong-Pocheon Expressway
Korea Expressway Corporation
Client
Korea Expressway Corporation
Construction Name
Steel Structure (Civil Engineering) Installation Project for Anseong-Guri (Section 14) of the Sejong-Pocheon Expressway
Scale
B=8 m, L=387 m B=16 m, L=68 m
4
Junghwa Bridge Installation and Demolition for Pohang-Yeongdeok Expressway Section 5
Korea Expressway Corporation
Client
Korea Expressway Corporation
Construction Name
Junghwa Bridge Installation and Demolition for Pohang-Yeongdeok Expressway Section 5
Scale
B=8 m, L=216 m B=6 m, L=21 m x 7 locations B=6 m, L=21.75 m x 2 locations B=6 m, L=18 m x 4 locations B=6m, L=18.75m x 3 locations
3
Temporary Bridge Supply and Installation for the Nano Bridge Construction Project to Support the Nano National Industrial Complex
Miryang City
Client
Miryang City
Construction Name
Temporary Bridge Supply and Installation for the Nano Bridge Construction Project to Support the Nano National Industrial Complex
Scale
B=8 m, L=200 m B=4 m, L=25 m x 3 locations
2
Temporary Bridge Installation Work for the Daejeon Second Expo Bridge (Tentative Name) Construction Project (Temporary Bridge Installation Work)
Shinsegae Engineering and Construction Co., Ltd.
Client
Shinsegae Engineering and Construction Co., Ltd.
Construction Name
Temporary Bridge Installation Work for the Daejeon Second Expo Bridge (Tentative Name) Construction Project (Temporary Bridge Installation Work)
Scale
B=10 m, L=200 m B=12 m, L=25 m x 3 locations
1
Temporary Bridge Installation and Dismantling Work for Section 2 of the Daegu Outer Ring Road on Expressway Route 700
Korea Expressway Corporation
Client
Korea Expressway Corporation
Construction Name
Temporary Bridge Installation and Dismantling Work for Section 2 of the Daegu Outer Ring Road on Expressway Route 700
Scale
B=12 m, L=44 m B=8 m, L=170 m B=10 m, L=23 m x 3 locations