No.

Construction Name

Client

  • 12

    Sacheon Aviation Industrial Bridge Construction Project

    Busan Regional Construction and Management Administration

    Sacheon Aviation Industrial Bridge Construction Project
    • Business Areas

      Temporary bridge construction

    • Client

      Busan Regional Construction and Management Administration

    • Construction Name

      Sacheon Aviation Industrial Bridge Construction Project

    • Project Overview

      Construction of a temporary bridge for the Sacheon Aviation Industrial Bridge connecting Sanam-myeon and Gonyang-myeon in Sacheon-si, Gyeongsangnam-do

    • Scale

      Starting section: L=453.6 m (main line 362 m, bridge 91 m), B=6–8 m, area=3,240 ㎡

  • 11

    Installation and removal of a temporary bridge for Section 3-3 of the Busan Eco Delta City construction project

    K-water

    Installation and removal of a temporary bridge for Section 3-3 of the Busan Eco Delta City construction project
    • Business Areas

      Temporary bridge construction

    • Client

      K-water

    • Construction Name

      Installation and removal of a temporary bridge for Section 3-3 of the Busan Eco Delta City construction project

    • Project Overview

      Installation and removal of a temporary bridge for Section 3-3 of the Busan Eco Delta City construction project

    • Scale

      B=10 m, L=140 m

  • 10

    Gwangyang Port Regional Dredged Soil Disposal Site Construction Project

    Ministry of Oceans and Fisheries

    Gwangyang Port Regional Dredged Soil Disposal Site Construction Project
    • Client

      Ministry of Oceans and Fisheries

    • Construction Name

      Gwangyang Port Regional Dredged Soil Disposal Site Construction Project

    • Scale

      B=10 m, L=199 m B=10 m, L=212 m

  • 9

    Installation and Dismantling of the Temporary Cheongdam Bridge in Section 1 of the Public Contribution Direct Provision Facilities

    Hyundai Motor Co., Ltd.

    Installation and Dismantling of the Temporary Cheongdam Bridge in Section 1 of the Public Contribution Direct Provision Facilities
    • Business Areas

      Temporary bridge construction

    • Client

      Hyundai Motor Co., Ltd.

    • Construction Name

      Installation and Dismantling of the Temporary Cheongdam Bridge in Section 1 of the Public Contribution Direct Provision Facilities

    • Project Overview

      Cheongdam Bridge temporary bridge construction

    • Scale

      Cheongdam Bridge 1: L=94 m, B=8 m, Area=752 ㎡ Cheongdam Bridge 2: L=99 m, B=18 m (outer), Area=1,782 ㎡

  • 8

    Temporary Bridge over Wolha Stream for the 00 Airfield Integration Relocation Construction Project

    Korea Land & Housing Corporation

    Temporary Bridge over Wolha Stream for the 00 Airfield Integration Relocation Construction Project
    • Business Areas

      Temporary bridge construction

    • Client

      Korea Land & Housing Corporation

    • Construction Name

      Temporary Bridge over Wolha Stream for the 00 Airfield Integration Relocation Construction Project

    • Project Overview

      Wolhacheon Bridge temporary bridge construction

    • Scale

      B=8 m, L=55 m

  • 7

    Steel Structure Work (Superstructure of the Temporary Work Platform) for the Unmun Dam Safety Improvement Construction Project

    K-water

    Steel Structure Work (Superstructure of the Temporary Work Platform) for the Unmun Dam Safety Improvement Construction Project
    • Business Areas

      Temporary bridge construction

    • Client

      K-water

    • Construction Name

      Steel Structure Work (Superstructure of the Temporary Work Platform) for the Unmun Dam Safety Improvement Construction Project

    • Project Overview

      Steel Structure Work (Superstructure of the Temporary Work Platform) for the Unmun Dam Safety Improvement Construction Project

    • Scale

      B=6 m, L=26.9 m B=6–10 m, L=64.8 m

  • 6

    Seosan Hyundai Motor Straight Driving Test Road Infrastructure_Temporary Construction Bridge Installation and Removal

    Hyundai Engineering & Construction Co., Ltd.

    Seosan Hyundai Motor Straight Driving Test Road Infrastructure_Temporary Construction Bridge Installation and Removal
    • Client

      Hyundai Engineering & Construction Co., Ltd.

    • Construction Name

      Seosan Hyundai Motor Straight Driving Test Road Infrastructure_Temporary Construction Bridge Installation and Removal

    • Scale

      B=10 m, L=85 m

  • 5

    Steel Structure (Civil Engineering) Installation Project for Anseong-Guri (Section 14) of the Sejong-Pocheon Expressway

    Korea Expressway Corporation

    Steel Structure (Civil Engineering) Installation Project for Anseong-Guri (Section 14) of the Sejong-Pocheon Expressway
    • Client

      Korea Expressway Corporation

    • Construction Name

      Steel Structure (Civil Engineering) Installation Project for Anseong-Guri (Section 14) of the Sejong-Pocheon Expressway

    • Scale

      B=8 m, L=387 m B=16 m, L=68 m

  • 4

    Junghwa Bridge Installation and Demolition for Pohang-Yeongdeok Expressway Section 5

    Korea Expressway Corporation

    Junghwa Bridge Installation and Demolition for Pohang-Yeongdeok Expressway Section 5
    • Client

      Korea Expressway Corporation

    • Construction Name

      Junghwa Bridge Installation and Demolition for Pohang-Yeongdeok Expressway Section 5

    • Scale

      B=8 m, L=216 m B=6 m, L=21 m x 7 locations B=6 m, L=21.75 m x 2 locations B=6 m, L=18 m x 4 locations B=6m, L=18.75m x 3 locations

  • 3

    Temporary Bridge Supply and Installation for the Nano Bridge Construction Project to Support the Nano National Industrial Complex

    Miryang City

    Temporary Bridge Supply and Installation for the Nano Bridge Construction Project to Support the Nano National Industrial Complex
    • Client

      Miryang City

    • Construction Name

      Temporary Bridge Supply and Installation for the Nano Bridge Construction Project to Support the Nano National Industrial Complex

    • Scale

      B=8 m, L=200 m B=4 m, L=25 m x 3 locations

  • 2

    Temporary Bridge Installation Work for the Daejeon Second Expo Bridge (Tentative Name) Construction Project (Temporary Bridge Installation Work)

    Shinsegae Engineering and Construction Co., Ltd.

    Temporary Bridge Installation Work for the Daejeon Second Expo Bridge (Tentative Name) Construction Project (Temporary Bridge Installation Work)
    • Client

      Shinsegae Engineering and Construction Co., Ltd.

    • Construction Name

      Temporary Bridge Installation Work for the Daejeon Second Expo Bridge (Tentative Name) Construction Project (Temporary Bridge Installation Work)

    • Scale

      B=10 m, L=200 m B=12 m, L=25 m x 3 locations

  • 1

    Temporary Bridge Installation and Dismantling Work for Section 2 of the Daegu Outer Ring Road on Expressway Route 700

    Korea Expressway Corporation

    Temporary Bridge Installation and Dismantling Work for Section 2 of the Daegu Outer Ring Road on Expressway Route 700
    • Client

      Korea Expressway Corporation

    • Construction Name

      Temporary Bridge Installation and Dismantling Work for Section 2 of the Daegu Outer Ring Road on Expressway Route 700

    • Scale

      B=12 m, L=44 m B=8 m, L=170 m B=10 m, L=23 m x 3 locations